On queue design: why figure-eight parks felt slower in the 1990s
A note on queue design in US regional parks during the 1990s and why, even with lower overall attendance than today, a figure-eight park could feel bottlenecked.
A quick entry prompted by a conversation with a passholder who started visiting parks in the late 1980s. We disagreed about why older parks sometimes feel slower.
The argument
Her claim: parks in the 1990s felt slower because the rides were slower.
My claim: parks in the 1990s felt slower because the queue switchbacks were longer than the queues.
Neither of us is entirely right.
The actual thing
Queue switchbacks in a typical 1990s regional park were sized for peak-summer Saturday capacity. Off peak, the switchback was mostly empty, but the physical path was still there. A visitor who entered the queue on a quiet weekday walked the full switchback to the boarding platform, even if nobody else was in the line. The walk itself took three to four minutes.
This produced the sensation of a slow park even when actual wait times were short. Modern parks have adjusted — the switchbacks are now articulated with retractable rope dividers, so when demand is low the queue is effectively shorter in terms of distance walked.
Figure-eight parks, which concentrated popular rides at the loop apexes, felt this effect more than hub-and-spoke parks. The walk from the plaza to the queue entrance was already long. Adding a two-minute switchback walk compounded the perception of slowness.
Other factors
Ride length. A 1990s steel coaster averaged 110 seconds. Modern equivalents average 90. Over a six-ride day this adds up.
Load/unload time. Operators in the 1990s were trained on a less efficient dispatch cycle. Newer operations average 12 seconds per dispatch, where 1990s equivalents averaged 20.
Water rides closed earlier in the evening. This changed the rhythm of a visitor's second half of the day.
None of these is the single reason. Taken together they explain the perception.
Entry updated January 2021 with corrected load-cycle estimates per reader K. Ramsay.
Archived comments
Comment threads ran on this blog from 2018 through 2022. These are preserved as part of the site's historical record.
I always thought this had to do with the switchback length. Good point about the plaza.
You missed that most parks shortened the switchbacks mid-90s. That was a bigger factor.